Sign up to receive a text message or email when new bids are added!
Bid Number: TS-2017-017
Bid Title: College Way and Riverside Drive Corridor Signal Upgrade
Category: Public Works
Status: Closed
Bid Recipient: Award: Colacurcio Brothers $1,449,514.00

Description:

Notice is hereby given that sealed Bids for the “College Way and Riverside Drive Corridor Signal Upgrade Project” will be received by the City Finance Director until 10:00 am, June 11, 2019, at which time the Bids will be opened and publicly read. Bids will be delivered to 910 Cleveland Avenue, Mount Vernon, Washington. Proposals received after the time fixed for opening will not be considered.

This project includes signal head removals, upgrades, modifications, ADA curb ramp compliance, accessible pedestrian signal (APS), signal coordination, and the installation of flashing yellow arrow (FYA) left turn signal heads, wiring, and conduits. Contractor must pay prevailing wages.

Addendum 1 Issued 05/31/2019
Addendum 2 Issued 06/05/2019
Addendum 3 Issued 06/07/2019

Publication Date/Time:
5/21/2019 7:00 AM
Closing Date/Time:
6/11/2019 10:00 AM
Contact Person:
Mike Love (360) 336-6204
mvengineering@mountvernonwa.gov
Download Available:
Yes
Miscellaneous:
This project will go to Council for approval of award on June 26, 2019.
Related Documents:

Return To Main Bid Postings Page